my time in Victoria was fabulous! The city is festive with Christmas lights and displays everywhere. The capitol building is especially impressive. I was able to spend a lot of time with friends – Peter, Andrea, Julia, (Geordie and Zephryus), Dave Craig (faranda), Peter Harvey (Euphemia II) and jay and Dave from egmont. I was…
Blog
van isle to victoria
I left van isle to cruise to Victoria about 10:00. The trip is about 25 NM. Wind and wave predictions were 2 feet while I was protected running parallel to Vancouver island and then 4 feet from 10 mile point to Victoria harbor. The first 17 NM were as expected – quite windy and 2…
Euphemia launch and trip to goldstream
Euphemia was launched yesterday and all went well. This is Peter’s account of the day
Van isle marina
I called Nexus at about 10:00 yesterday to get my clearance # to cross in to Canada. Hold times were over 30 minutes, but the agent was very friendly and the process was quick. I departed Prevost about 11:00 and headed to Van isle marina. It is only about a 10 NM crossing. It was…
Santa visits Prevost harbor!
as I returned to Prevost harbor from paddling to the lighthouse, I saw a large ship at the community dock – the Salish express. She was all adorned with Christmas lights and merry Christmas banners. As I paddled closer to investigate, I saw a large group in costume … and a group of carolers. Nate…
December paddle
went for a paddle this morning from Prevost harbor to the lighthouse on the tip of Stuart island (and back). The winter brings a silence and peace but also a sense of isolation and some peril!
Prevost harbor
I had lunch with Kit P (Sockeye) at Downriggers today. We spent time catching up, but spent most of the time discussing our upcoming trip north to SE Alaska / starting the last week of May 2026 and returning in early September. Kit is very familiar with the routes and stops as she spent years…
port Angeles to Friday harbor
cruised from Port Angeles to Friday harbor Thursday 12/11. It is a 35 NM trip across Juan de fuca strait. The first 12 miles are subject to ocean swell traveling west to east from the open ocean. The entire crossing is open to wind waves with substantial fetch – so it can be spicy. Initial…
Clint Thompson interview on KPTZ – the working waterfront.
https://kptz.org/2025/12/09/our-working-waterfront-12-09-25
hung Nonchalant painting
I hung the Nonchalant painting that Margaryta painted. It is fabulous. It will look even better when Clint fabricates and installs the teak panel that will go behind it. For now it is just mounted on the bulkhead marine plywood.
Bronze door sills
Asa fabricated and installed a copper door sill and weather stripping on the port side wheelhouse door. Starboard side to follow. he is also fabricating the corner pieces for the aft wheelhouse caprails.
Margaryta thoughts on Nonchalant
interview KPTZ
I was asked to do an interview and tell the story of Nonchalant on a show that chronicles the working waterfront at Port Townsend. Here is a link. https://kptz.org/podcasts/working-waterfront
Commissioned Painting
I commissioned a painting of Nonchalant to hang on the aft bulkhead next to my grandfather’s drawer chest. The artist is located in Turkey. She did a painting of Argonaut II and posted it on Instagram – that is how I “discovered” her work. She used a photo of Nonchalant in Echo Bay.https://www.instagram.com/margaryta.woodart?igsh=eHB4dzZ0MDB1Z28
Copper caps
Asa fabricated and installed the copper caps on the seams of the wheelhouse cap rail. they are both decorative and functional (preventing water ingress at the joints).
Port Angeles – boathouse
I left Port Townsend about 0830 and headed to Port Angeles to put Nonchalant in the boathouse for the first time. Seas were calm and it was a nice 33 NM cruise. When I got to Port Angeles, I fueled Nonchalant up and treated the diesel for winter storage. I then temporarily tied Nonchalant to…
dash panel and wheelhouse lights
Taylor completed some of the electrical fixtures this week in PT. He wired some outlets. He finished the dash panel that he had fabricated and installed some directional lighting.
rugs and pillows
I have been consulting with Susan Shaw and others on how to “warm up” nonchalant by bringing in some colors and fabrics. Susan found this rug on Etsy and I looked for pillows… ended up just having the rug company make some throw pillows to match (they do not usually make pillow covers). It is…
paddle to Kala point with Mt Baker views – fresh snow!
back in port townsend
cruised from mystery bay to port townsend … left at 0800 and arrived at 0900. Moored at the linear dock. Taylor is going to complete some of the electrical work this week and I am going to meet with Clint and Asa to establish a list of interior projects to be completed … this will…
mystery bay
I arrived to calm waters and dropped anchor. It was a beautiful sunset and warm enough to enjoy from the aft cockpit. the calm weather was short lived as a stiff NW breeze developed overnight and with the tide ebbing made for a rolling night… I had an anchor alarm set and slept soundly. Still…
at anchor in mystery bay – welcomed back by the lighthouse at Point Wilson
San Juan island tour
I have documented my tour of the San Juan islands in the blog. This is just a summary. I left Port Townsend (after the wooden boat festival) on September 10. I had a list of favorite spots from kit pingree and got input from several other San Juan cruisers. I visited the following islands Lopez…
end of the San Juan island tour – James bay to Watmough – on to mystery bay
woke to some drizzle and after a couple cups of coffee and yoga practice in the wheelhouse, I had James island all to my self for about an hour! As I was getting ready to hike, a group arrived in a 17’ zodiac … 10 or 12 people. They are aboard the 1932 charter boat…
James island
the gale finally subsided last night and I was able to depart Blaine harbor and head south to James island. Kit Pingree has identified James island as one of her favorite spots but also cautioned that the tidal currents in the bay are very strong and somewhat counterintuitive as a Backeddy forms during the tide…
Leaded glass pattern
Clint contracted a local glass artist to fashion the leaded glass panes for the teak cabinets he built in the salon. This leaded glass has been a high design priority of mine. This is the pattern.
historical info from Kevin Mallory
in a previous post I detailed my meeting with Kevin Mallory. Today I received some photos and files regarding his grandfather’s ownership of Nonchalant (which he named Paramus II during his stewardship). it would seem that the information I had received prior regarding the timing of Ernest’s ownership was incorrect. It is more likely that…
rainy day in Blaine harbor
the forecast was correct and it has been a rainy and windy day here in Blaine.
Blaine
both Nicholas and I weighed anchor this morning and headed out of Prevost. Argonaut went to Vancouver for the open boat at the maritime museum this weekend and I headed to Blaine. The weather forecasts for this week are calling for lots of rain (2”) and high winds (25 knots SE). I faced some rolling…
Prevost harbor – turn point lighthouse hike and Argonaut II
I am going to hike out to the turn point lighthouse this morning. It is supposed to clear by midday when I hope to paddle around Stuart island. Later this afternoon, Nicholas will be coming to Prevost on his boat Argonaut II. Watch the video below to get a great view of Nicholas and Argonaut…
Roche harbor and westcott bay shellfish co
left garrison bay about 9:00 am to meet Kevin Mallory and his wife Julie. We had a good time talking about his family’s history on Nonchalant (Pamanus to them). Then we toured their brand new Helmsman trawler PH 43. When we were done I made a trip to the Roche harbor market and headed back…
return to Garrison Bay
I circumnavigated Sucia by kayak this morning. The SE wind, tidal current and swell made for a challenging paddle on the north side of the island. I checked weather when I got back and decided to move to Garrison Bay. The wind is forecast to increase to 15 knots SE overnight and Fossil Bay is…
Tad Roberts post
Tad Roberts was a judge at the Victoria Classic Boat festival. He made this post of Facebook. Tad is a yacht designer and widely respected expert in wooden boat design and structure. https://www.facebook.com/share/p/1Jm3KcXEeA/?mibextid=wwXIfr
Matia island
the fairly strong NW wind overnight made for a rolling sleep even at the dock. The swell entered the bay at 2 different points… but knowing I was securely moored I had a sound sleep. The leaves on the deciduous trees are turning and the colors on the shorelines are beautiful. view with coffee through…
jones island hike – Matia island
hiked the NW loop on jones island this morning and now preparing to cruise to Matia island – Rolfe cove. Hoping for space. tide is ebbing strong (new moon) so I am going against 1.3 knots of current traveling north to Matia. as I entered Rolfe cove I was expecting 3 mooring balls, but there…
Liepelt’s, Friday harbor, jones island
I left echo bay Saturday and went down to Liepelt’s on Griffin bay (San Juan island). I had stopped there with the CYA group on the way to port townsend wooden boat festival (from Victoria), but wanted time with them to talk about our sister boats Hulakai and Nonchalant. Had a wonderful dinner at their…
another day at Sucia
I am loving this anchorage. Great paddling and hiking… a great view of mt baker… and sunrises and sunsets that are stunning! I am planning to circumnavigate clockwise today in my kayak and hike to Ewing cove. Might move to matia this afternoon / might wait until tomorrow. there is a well developed and maintained…
circumnavigation of Sucia
it was very windy overnight but the anchor held and we stayed in place. It is still windy but has diminished a bit. I decided to kayak around Sucia counter clockwise to see all the bays / Moorage spots on the west side of the island. I cut across Ewing cove and then was out…
paddle east sucia island and hike to fossil bay
I paddled the east end of sucia island this morning and explored Snoring Bay, Fossil Bay and Ewing cove. There are two state docks in Fossil. After lunch I hiked back to fossil bay… steep climb up and then down to the other bay… and back. shallow bay
Sucia island
I will be heading to Sucia island this afternoon after paddling in Garrison Bay and walking the grounds of the old English Camp. I spent a little time this morning getting familiar with Sucia via YouTube. 15:30… anchored in echo bay with a view of Mt Baker.
Garrison Bay
paddled around garrison bay and neighboring west cott bay. Passed both the old English camp in garrison bay and the west cott bay shellfish company. I was hoping to stop in there for lunch but this time of year they are closed mon – weds. Next season! https://www.westcottbayshellfish.com toured the old English camp… got a…
Garrison Bay with an afternoon stop in swanky Roche Harbor
the started with a paddle to Reid harbor. The harbor is on the other side of a narrow strip of land that separates it from Prevost harbor. I have to agree with all of those who told me they prefer Prevost / both are beautiful. at the mouth of Reid harbor is a small island…
Prevost harbor – Stuart island
my destination today is Prevost harbor on Stuart Island. I am enthusiastic about this stop as it seems to be on everyone’s “must see” list… Faranda, Sockeye and Argonaut all rave about it. It offers great paddling and good hiking trails. STUART ISLAND Stuart Island is blessed with two large, protected bays on the north…
Skull Island in Massacre Bay
the fog finally lifted just after lunch and I weighed anchor and made my way to skull island in Massacre Bay… West Sound Orcas island. On the way I transited Wasp passage between several small islands… cliff and crane were especially interesting. I have dropped anchor and am waiting to make sure it is safely…
Barlow Bay to Parks Bay
I was hoping to leave Barlow bay in Mackaye harbor about 08:30 and arrive in Parks Bay around 10:00. The route is past cattle point and transits the San Juan channel. I have been told by some that it should be transited at slack and by others that say “just go” and punch through it….
San Juan Island cruise… first stop Mackaye harbor on Lopez island
Point Wilson welcomes mariners to port townsend and marks the start of the Juan de fuca strait crossing for northbound vessels.
aft cockpit
Daryl sanded the aft cockpit … there was not time before I left on the shakedown cruise. It looks fabulous now!
Shakedown / break-in cruise
I am preparing for my September cruise to explore the San Juan islands… busy charting potential routes and stops. I will leave port townsend in the morning. The Port Townsend Wooden Boat Festival was a fitting end to the shakedown break in cruise. I left port townsend on August 7th eager to cruise and to…
productive day at port townsend boat haven
I came to boat haven marina in port townsend following the sail past that concludes the wooden boat festival. I am here for a couple days. Taylor Clarke is doing some electrical work that did not get completed prior to my cruise north. Daryl is also aboard attending to some finish details that were unfinished….
Port Townsend Wooden Boat Festival
the port townsend wooden boat festival must be experienced as it is beyond adequate description. There is so much happening… speakers at 4 different locations running all day, vendors of all different types, food trucks, live music all day and late into the night and of course the marvelous collection of wooden boats. then there…
Disorienting paddle in dense fog
there was very dense fog in the harbor and bay Friday morning. I have paddled the area a lot having spent all of July here after the launch of Nonchalant (waiting for her to be ready to leave!). I decided to paddle even though the conditions were “less than ideal.” I planned to paddle to…
Port Townsend Wooden Boat Festival
woke in mystery bay to dense fog. I paddled in the fog along the barely visible shoreline of Marrowstone island to scow bay and back before departing to be at point Hudson at noon. It was a foggy trip over and having AIS and radar made it possible / could not have done it in…
Mystery Bay
we departed Mackaye harbor at 0700 on route to Mystery Bay. In retrospect, we should have waited another couple hours to allow the flood tide/current to start and flatten some of the swell – Thelonius was more concerned with afternoon winds so we left early. It was a nice crossing anyway. I am starting to…
Mackaye Bay
cruised through Cattle Pass to Mackaye Bay with Thelonius… met Compadre already anchored. We will cross the strait of Juan de Fuca this morning and anchor in Mystery Bay – a short distance from Port Townsend and a good staging spot for noon arrival at Point Hudson tomorrow and the Port Townsemd Wooden Boat Festival….
Liepelt’s
I left Victoria causeway about 8 am to cruise to Richard Liepelt’s home near Friday harbor on San Juan island. I waited to get started until Thelonius was able to get out of their berth and then we cruised together. For the first part of the trip we were alongside Messenger III and Glorybe as…
”Best Restored Powerboat – Nonchalant”
the Victoria Classic Boat festival ended with an awards banquet where Nonchalant was awarded the “Best Restored Powerboat” award for the 2025 show. Congratulations to everyone who worked on her. It was a large team led by shipwrights Clint Thompson and Asa Clifford. Systems and metal fabrication by Taylor Clarke. Navigation, heating and plumbing –…
Victoria Classic Boat Festival
cruised from Cadboro bay to Victoria inner harbor – the causeway docks. The docks are directly in front on the Empress Hotel and the Provincial Capital Building is on the side. Close to 100 beautiful classic yachts are here and it is quite a process to get everyone safely tied to docks and rafted between…
Ganges to Cadboro bay
I left Ganges a bit later than planned as a few more CYA members requested to come aboard and view Nonchalant. I pumped the Black water tank before leaving … first time – all went smoothly. Wind was from the SE (waves on bow and spray on deck and windshield) and there was a lot…
Classic Yacht Association Canadian Rendezvous – Kanaka docks – Ganges
cruised from Pirate’s cove to Ganges this morning to attend the CYA annual rendezvous. docked without issue and was greeted by many eager to see Nonchalant. my friend and longtime member of the CYA – Diane Lander -presented me with a wonderful “boat warming gift!” Very thoughtful. A monogrammed mat for boarding – protecting the…
Circumnavigate de courcy island by kayak
I left pirate’s cove and paddled around de courcy island clockwise. There are some wonderful sandstone etchings on the high banks on the outside of the island. At the top of the island there is a narrow passage (isthmus ) that dries at low tide. I portaged across that and gathered some fresh oysters for…
Madeira to Pirate’s cove – crossing the strait of Georgia … slack at Gabriola pass… navigating Pirate’s cove entry at low water!
left Madeira at 06:30 to make my way across the strait of Georgia to Pirate’s Cove. Strong wind warning with 20 knot winds from the NW. I could be facing 2 foot waves on the beam! I am traveling on an ebb tide which should help flatten the wind waves. My route takes me south…
paddle the Copeland islands, install a swim ladder and cruise to Pender harbor
Catalin installed the swim ladder today… improves safety and makes it much easier to board from the water. I paddled around the Copeland islands early.. then cruised to Pender harbor to get groceries and spend the night.
back to Lund
after paddling Thursday, I cruised back to Lund and tied to breakwater #2 dock. I do not need shore power as the solar is keeping the batteries at 100% during these clear sunny days. Catalin will install a ladder on the swim grid tomorrow which will make getting aboard from the water much easier and…
late afternoon swim at black lake… moon jellies… Nonchalant at anchor
paddle to Curme islands
the Curme islands are located just at the tip of Mink island. they are a favorite spot for kayak campers in desolation sound as they are in a central location and have platform camping sites as well as pit toilets. Lots of day paddles to the most favored coves and bays are within reach.
Salon sole
I cleaned the salon floor this morning and applied the first coat of floorfin. I will lightly sand and apply a second coat in a couple days. The wheelhouse sole had a lot of traffic (guests onboard) before it was fully set so it also needs a light sanding and final coat. I think this…
Melanie cove
I left cassel falls after lunch in the rain and by the time I arrived at Melanie cove the sun was shining! Found a nice spot to anchor with a stern tie chain. Got settled and then went for a short paddle. while I was paddling I came across something unusual – a fresh water…
change of plan… Cassel falls for lunch and then Melanie Cove
the rain has not relented though the forecast is still calling for sunny skies this afternoon. One thing rain is good for is waterfalls! Cassel falls in teakerne arm is a short distance from refuge cove so I am weighing anchor and heading there for a lunch stop… then back down to Melanie cove to…
rainy morning in refuge cove
it rained most of the night and is raining this morning … so I am enjoying just swinging at anchor in the bay around the corner from refuge cove marina. I plan to head to Prideaux Haven – Melanie Cove today, but I am going to wait until late morning. The tide is very low…
off to Refuge Cove
I left Roscoe Bay about 2 pm… multiple boats coming in made for some “negotiating” to get out without having to pass side by side over the sand bar. It is a short (8NM) cruise to refuge cove. I am hoping to drop garbage at Carl’s barge ($2/pound), do laundry, provision with groceries and fill…
paddle from Roscoe bay to prideaux haven and back
I chose to paddle to prideaux haven this morning because it has amazing views, an open water crossing and mostly because I wanted to check out how busy it is as I am planning on anchoring there tomorrow night. It was a great paddle. On the way I passed Glorybe and had a chance to…
Roscoe Bay day 2
woke to calmer weather and the sun trying to break through the clouds. I took advantage of the calmer water and paddled across Waddington channel to Otter island cove. There were two boats anchored there. They were heading to Roscoe today… so I will see them again soon. Otter island cove is quite protected but…
Grace Harbor to Roscoe Bay (with a detour to explore Okeover inlet)
My plan today is to cruise from Grace harbor to Roscoe bay. My batteries need some charging so I am going to go further in to Okeover inlet and explore before heading to Roscoe. Roscoe bay has a sandbar that “dries” at low tide – so I have to time the entrance to coincide with…
Grace harbor day 2
it rained a bit over an inch in the last 24 hours exposing some small leaks along the salon house sides. They seemed to close and slow a bit as the wood swelled. Nothing major. More rain in the forecast. Late in the afternoon there was some brief clearing and I went for a paddle….
Grace Harbor
cruised from Lund to Grace harbor this morning. Low pressure system has arrived, and winds are SE. this is a protected bay. An “atmospheric river” is predicted starting late this afternoon and extending until Tuesday with the heaviest rainfall tomorrow (Friday). Expected total rainfall exceeding 2 1/2 inches. I arrived without issue but then had…
Lund
cruised from Egmont to Lund today. About 40 NM. Jervis inlet was 2 1/2 foot waves with whitecaps – nonchalant handles it with ease and was quite comfortable. Lots of spray over the bow, but no banging on waves. The run in Malaspina strait was calmer and by the time I reached Lund seas were…
interior shots – salon
Chatterbox falls paddle
enjoyed a great paddle in Princess Louisa inlet. A special treat – the wonderful classic yacht Olmaha is on a mooring buoy. It is stunning. https://classicyachtinfo.org/yachts/olmaha
Princess Louisa inlet
left egmont at 0900 and headed for Princess Louisa inlet … chatterbox falls. There is a narrow opening to the inlet that has to be transited at or near slack. I arrived at the mouth of the inlet with time to have lunch before heading through the rapids. The inlet mooring balls were all occupied…
garden Bay to egmont
anchored in Garden Bay after the Pender harbor wooden boat parade. All ground tackle worked flawlessly and Nonchalant stayed in place all night. Weighed anchor about 0900 and headed for Egmont where the new owners of the cottage I sold graciously allowed me to moor overnight. It is great to be back and see friends…
van isle to Pender harbor
woke at 0500 to prep to depart Van isle Marina and cruise to Madeira park in Pender harbor. My good friend Dave who lives in Saanich with his partner Jay was onboard for the trip. He made sushi for our lunch! Delicious. We were off the dock about 0700 and Jay took pictures of our…
Clint’s take on the day Nonchalant left Port Townsend
Yesterday was pretty surreal. A boat/project that has been a huge part of my (and others) life for 2 years motored away to cruise the rest of the summer and fall. I’ve taken myself into the “void” pushing hard on other projects before, but this one went a bit deeper than any other I believe….
and we’re off!
it was a mad dash to get ready to leave Port Townsend and head to Van Isle Marina (north of Sidney BC). I was loading the boat while Clint and Taylor were busy with last details, cleaning and removing tools and materials. Nicole installed the setters and they were perfect. Coincidentally, Doug Lombard and his…
fo’c’sle / moving in
started “moving aboard” today… made a bed. Filled the dresser and hanging locker with clothes. It is a fabulous space. the Raven blanket was woven by Haida Gwai artist April White. Aprilwhite.com https://www.aprilwhite.com
Upholstery
Nicole brought down the bench seats for the wheelhouse (which Asa installed) and one of the mattresses for the fo’c’sle. The rest is ready for install… but awaiting cessation of sawdust! The bench seat backs will complete the wheelhouse seating.
Butterfly hatch, spotlight, steaming light, chain locker and bell
a lot of fun pieces coming together… chain locker and spill pipe butterfly hatch, teak center strake and mcmurry windlass steaming light and mounting block
midship cleat
Asa installed original cleats midship… this should allow for “neutral” boat handling and springing – especially handy when I am single handing. The cleats are really cool!
wheelhouse sole
Asa fabricated, and installed the wheelhouse sole (pine)… it is glued and fastened with screws… fit to the engine bay hatches. Then he sanded and applied the first coat of Floor Fin. It looks fabulous!
launched the Highfield dinghy
launched the Highfield today! Had a fun little test run. It hit 19.7 knots wide open but felt really comfortable around 15 knots. Really stable.
trim plugs
countless plugs have been cut, glued, trimmed, painted and varnished. Every fastener on the hull..every exposed fastener in the trim, cabinets and sole… tedious and requires attention to detail – even trying to match grain!
Salon
Clint is working feverishly to complete the salon. He has almost everything made – drawers, doors, cabinets and trim… install over the next couple days! Jen L is helping with sanding and varnishing.
wheelhouse varnish
Daryl applied the last coats of varnish in the wheelhouse yesterday and today … things are still taped and pieces not in place – but here is a look
paddle to Flagler State Park
Flagler State Park is across Port Townsend Bay on Marrowstone island. There is a large sandy beach and a tidal spit that extends a long distance at low tide. The water gets shallow about 1/2 mile from the spit and large currents form as water channels between Marrowstone and Indian islands. It is a fun…
sea trial report and data
sunny afternoon paddle – Kala point
Nonchalant sea trial (video below)
we pushed off from slip D229 about 1:45 pm and headed over to the work dock where we loaded the ground tackle (chain and anchor). We wanted the boat with a full load for the sea trial. We had topped off the fresh water tanks prior to leaving the slip. Then we headed to the…
chain locker
Clint built and installed the chain locker. It has a cone in the center to prevent the chain from castling, spilling over and tangling/knotting. A custom spill pipe is being fabricated as well. We will load the chain later today for sea trials and stability tests… then remove it to paint the chain locker.
Maiden “voyage” – Nonchalant
the port has a 14 day limit on stays at the work dock so we had to move Nonchalant to an open slip – D229. The slip is only 40’ long and there is a wide beam sailboat next door. this was the first time we have left the dock under power, so we really…
Kala point
the kayaking around port townsend is fabulous. Paddled to Kala point today… about 4 miles south of port townsend. Long stretch of wonderful sandy beach. Mount Baker is visible during the entire paddle.
Butterfly hatch
Daryl is applying final varnish coats on the teak butterfly hatch and center strake… stunning!
salon teak trim
Clint is fabricating and dry fitting the teak trim pieces in the salon… going to be gorgeous!
copper shower pan
Asa installed the copper shower pan in the head. It came with the boat (but is likely not original). It has two drain holes that empty in to a grey water sump that will be shared with the sink. There is a pump in the sump with a float switch – discharge overboard. There is…
sneak peek – fo’c’sle drawer faces
Daryl finished varnishing the fo’c’sle drawer faces today and we installed 6 of them… we will install the rest tomorrow (hopefully). The tip out drawers and dresser drawers still to come. Beautiful!!
yanmar 4LV 150 – first start today! Videos below
transom letters mounted
mounted the transom letters today – bedded in dolfinite and attached with bronze screws. The current plan is to allow the lettering to have a natural patina (vs clear coat or constant polishing).
Transom lettering
the bronze transom lettering with the yacht name (NONCHALANT ) and hailing port (SEATTLE) were cleared coated and badly discolored and peeling. I sanded and buffed them today in preparation for mounting on the transom soon. I did not think to take a “before” picture 🤦♂️. the picture above can serve as a “before” picture,…
launch video shot and edited by K.G. Leenhouts
work dock
we moved Nonchalant to the work dock at 7:30 am. This will be her home until she is complete and I depart for cruising. Bilge was still dry – pumps have not run at all since she splashed 18 hours ago.
Splash day!
the crew was busy all day preparing for the launch of Nonchalant. Fenders, dock lines, and many last minute details… lift arrived about 2:30 and the lift, journey through the yard and drop to the water could not have gone better. When Nonchalant was floating she was perfectly balanced and the bilge stayed dry!! The…
Paddling
I arrived in Port Townsend Saturday the 28th. I headed to the boathouse in Port Angeles first thing Sunday to check on it and pick up my kayak. It has been way too long since I have been paddling I paddled in Port Angeles Sunday and today in Port Townsend. My paddle today was out…
Upholstery
Nicole is hard at work on the upholstery… it’s crunch time!!
Big Day! The shelter came down today!
the team carefully removed scaffolding and ladders from the shelter this past weekend. Today… the shelter was removed. The shelter was built in two pieces so they could be removed separately. This will allow the Perpetual Boatworks team to reuse it for future projects. It feels like a birth… Nonchalant emerging from a cocoon. While…
Fo’c’sle drawers
Clint fabricated the maple drawers, Ismay sanded and prepped them, Jen did the finish work and now Leigh is hanging them on slides. Last week, Leigh milled, glued up and sanded the teak drawer fronts. They still need to be profiled and then Daryl will varnish. the drawer fronts being fitted… still have to be…
fo’c’sle teak pieces close to final varnish coats… stairs, beam caps, doors and bunk rails
Glass faces for breaker panels
Final Paint coats (2) on hull and saloon sides
Daryl is applying the final coat of paint on the hull and saloon side today!
Drawers
Clint built the drawers out of maple. They will have teak fronts (varnished). Beautiful and tons of storage.
Final varnish coat (12) on the wheelhouse exterior
Daryl is applying the final varnish coat to the wheelhouse this weekend!
Fo’c’sle mattresses
Nicole has cut the foam for the fo’c’sle mattresses. Clint and Asa approve! The sole has also been finished and reinstalled.
House bank overview
Windlass power overview
Taylor refurbished the original McMurry windlass. He added a new motor and automatic controls with a chain counter. This is Taylor describing the windlass power system.
teak beam caps in the fo’c’sle
Leigh fabricated and installed the teak beam caps on the deck beams in the fo’c’sle!
windlass wiring
Taylor wired the windlass this week. We decided to have the windlass run off a dedicated battery in the chain locker section of the bow. This allowed for a much shorter wire run. The battery is housed in a custom cabinet and will be on a trickle charger. The install was a bit more involved…
Deck and cockpit teak seams are payed with compound
teak deck seam compound
Asa is taping the deck and applying teak deck seam compound.
teak center blocking
Bird blocking in the fo’c’sle
Leigh milled “bird blocking” to fit between the deck beams in the fo’c’sle. They are designed to allow adequate ventilation.
wheelhouse / fo’c’sle door
Asa built a new frame and installed the door between the wheelhouse and fo’c’sle. This is the original door. While the entire hull, deck and much of the interior is all new, the cabin and much of the wheelhouse is original.
Dash switchboard
in an earlier post, I showed pictures of the dash switchboard that Taylor fabricated. Last week he 3D printed a piece that will act as a shroud behind the LED lighting that will illuminate the dash switch labels. Pretty cool!
Running lights
Taylor refurbished and installed the running lights. The fixtures are original with internal components upgraded to LED. In another nod to the modern, he installed a camera in the box that holds the stern running light. This will enable me to see how close I am to docks and other boats moored to the docks…
Overhead lighting
Taylor refurbished the overhead lighting fixtures. With a nod to the modern and for the sake of efficient power use… he upgraded the internal components to LED.
finish work
Daryl is applying finish coats to the saloon interior pieces (which should get reinstalled next week) as well as varnish coats on the interior and exterior of the house. She also applied another coat on the Buffalo rails.
wheelhouse glass and sliding doors installed – video
Copper patches!
Asa is fabricating copper patches for placement in several areas to protect from fresh water intrusion and cover some of the older “tired” joints. They are both functional and exquisite!
preparing the deck for seam compound and glass install
Asa is preparing the deck for seam compound. He is in the process of doing all the tasks required to “dry in” the exterior of Nonchalant in preparation for removing the shelter. He has also installed the glass… really a huge leap in “looking ready.” It still needs to be permanently fit. The windshield installed…
saloon pieces primed
Clint disassembled the saloon and Daryl primed all the pieces. They will be puttied again, sanded and primed one more time.
Tip out drawers
Leigh built the tip out drawers for the fo’c’sle. They are maple boxes with teak faces and are placed nearest the sole. This design makes the most of the storage space available (this is where the hull curves down to meet the keel – so this design conforms to the space ).
Pitch in the Saloon
Clint and Asa made and poured pitch in the saloon. This will allow any water in the bilge to pass over the frames and flow to the bilge pump sumps. It also seals and helps protect the planks at the lowest part of the hull.
June 30th 3:30 pm
fo’c’sle door
Leigh hung the door that separates the fo’c’sle from the storage / chain locker area.
Saloon buildout
Clint has been working on the saloon and galley buildout. The settees will convert to bunks with the starboard side being a full 6’5” berth. The backs of the settees will be hinged on the shelves behind and lift up to expose the full berth. Bedding can be stored in the space behind the back…
saloon – stanchions, brackets and settee.
The saloon is taking shape! Clint has built out and fit the settees. They convert in to sleeping berths when the backs are removed and hung above. Taylor has made custom stanchions and brackets (bronze)… a standout custom feature. They are beautiful and also serve a structural purpose in place of full height bulkheads.
Spotlight
Taylor retrofitted and LED lamp in to the spotlight (replacing the halogen). The spotlight has an original handle control in the wheelhouse and mounting bracket.
Pitch in the bilge
the shipwrights are pouring pitch in the bilge. The hot pitch solidifies and forms a water resistant barrier, ensuring that any water that does enter the bilge will flow over the frames and in to the bilge pump sumps. This prevents any water from accumulating in the bilge and pooling in inaccessible areas – protecting…
Swim step
Daryl has been working on the swim step…first sanding, putty and primer. Then measuring for tape and applying tape. Next step was applying non skid… I use the swim step to get in and out of my kayak – a nonskid surface is going to be really great!
Tender delivery
the Highfield Classic 310 with Tohatsu 20Hp engine was delivered by Guyer Boatworks on Wednesday. While not a classic tender, I think it will provide the ability to explore while at anchor, motor to marinas to get supplies etc without having to find moorage space and provide a measure of safety in case of any…
Port Townsend visit – Maple for drawer boxes
I visited Port Townsend this week to see Nonchalant in person and meet with the team. It was a fabulous visit! The work on Nonchalant is stunning and moving along… though a launch date has not yet been established 🤞🤞. I went to Edensaw with Clint and Leigh on Wednesday and they selected maple boards…
wheelhouse cabinets – new dash
Asa is building out a new dash. The panel behind the wheel is stunning! Check out the tilt out gauge panel! Can’t wait to see it next week when I visit Port Townsend!
Buffalo rails varnished
Daryl sanded the Buffalo rails last week and is varnishing this week. Wow! and some trim… caps on the wheelhouse and wheelhouse trim…
Electric panels
Taylor has built and installed the electric switch panels mounted in the slate richlite.
Sole in the fo’c’sle
Leigh has started to cut and layout the pine sole in the Fo’c’sle. You can also see the door he milled for the hanging locker. Fabulous work.
Pine for sole
the Pine for the sole was sourced by Edensaw and delivered yesterday. Planks will be 8” wide and finished with a hard clear drying finish – floorfin. K 9 approved by Hazel! Classic yacht fans will notice the beautiful fantail yacht Teal in the background. https://classicyachtinfo.org/yachts/teal https://classicyachtinfo.org/yachts/teal
Mast
Daryl determined the mast had too much wear to be varnished and would look much better if she was able to use putty to repair and then paint it white. It is original and we are trying to keep as much original work as possible. Then Daryl came up with the idea of doing a…
chain locker door and trim
Leigh milled and built the trim and door for the chain locker. The door is teak and will be varnished.
Dash
Asa cut and installed / glued down the dash. The material is richlite slate. https://www.richlite.com/product-page/slate
House tie rods
Asa fabricated and installed the exposed bronze tie rods in the house this week. They will be a stand out feature in the wheelhouse.
Saloon rough fit
Clint has completed the rough fit of the saloon. Lots of details left to work out (and of course build), but this is BIG!
Hydronic system
Scott G is completing the work on the hydronic heating system… this week included plumbing summer and winter loops. Nonchalant will be warm in any weather and ready for an Alaskan voyage!
Fo’c’sle progress
Leigh continues to build out the fo’c’sle. This week included installing trim on the cabinets and building out the toe kicker for the heater register. Beautiful detail… even the clamps are cool! He also produced a video of the work – quite fun!
Trim pieces
Asa made and installed trim on the wheelhouse and saloon. He also came up with a creative means of covering the tired joints on the wheelhouse caps.
cockpit overhead
the cockpit will be a center of activity in season. Daryl finished painting the overhead section this week.
Electrical
taylor continues electrical install… I love how organized and tidy the control center is!
Daryl painting the swim step
painted with a non skid white.
Head
Asa started building out the head.
fo’c’sle trim
Leigh milled trim for the hanging closet (port) and drawer cabinet (starboard). It will get a bright varnish finish. Beautiful!
Water tanks
we had stainless water tanks manufactured locally by Alaskan Copper and Brass Co. they are installed at the aft end of the saloon. Capacity is approximately 130 gallons.
fo’c’sle progress – stairs and bunk rails
Leigh completed the stairs and bunk rails in the fo’c’sle. This is going to be an awesome space! All of these pieces are teak and will be varnished.
Buffalo rails
Buffalo rails are permanently glued and bolted. Bungs are installed over bolt heads to keep moisture out and enhance appearance.
Step caps
Clint and Asa made caps for the break beam steps and made and dry fit the trim to go around the bottom of the house.
throttle control
Asa dry fitted the new throttle control. It will be permanently mounted when the new dash is built and installed (there is a mock up in place).
steering pump
Nonchalant will have hydraulic steering. Asa made and installed the bracket that will hold the pump (and installed the pump). The bracket is 1/4” stainless steel mounted with exposed bronze carriage bolts.
Bow stem attached
Saloon overhead – paint
Daryl painted the saloon overhead and it looks fabulous. If you have been following along you will remember that the old paint contained lead and needed to be safely removed (see prior posts). Removing the dangerous old paint and prepping the surface for new paint has been a time consuming and intense process. But look…
Wheelhouse bench seats
the shipwrights finished the woodwork on the seating cabinets in the wheelhouse. The starboard cabinet is where the house batteries and electrical center is located… the port cabinet is storage. Both cabinets will have upholstered cushions and backs for comfortable wheelhouse seating. The seating is at window level providing a wonderful 360 view. There is…
Handrail – and a new idea
Pete Leenhouts took some photos of the handrail work (posted below)… here are some more that the crew took. While the handrail is quite attractive, the side decks are narrow and the handrail takes up a lot of what otherwise would be good footing for walking along the house sides. i am leaning towards leaving…
Butterfly Hatch
the butterfly hatch needed to be completely disassembled … glass replaced, hardware polished and refurbished, wood sanded, puttied and varnished… it is a standout feature of the forward deck and the fo’c’sle …
Sneak peek of this week’s work – and some info on Riptide (pictured above)
my friend Pete visited Nonchalant yesterday and sent some photos of what is happening this week. Pete owns the classic yacht Riptide (above photo). He has undertaken massive restoration and maintenance projects with the support and work of Port Townsend Shipwrights Co Op. he has been a great support during the rebuild of Nonchalant. Here…
Final paint coats in the fo’c’sle
Daryl and Ben primed the fo’c’sle (see prior post) and then sanded and sanded. The first of two final coats was applied Monday 2/24. A second final coat being applied today. first coat pictures after final coat (lighting kinda hides the difference)
Bow roller and windlass installed
Paint primer in the fo’c’sle
Leigh is away on a sunny vacation so Daryl is working in the fo’c’sle to get it puttied, sanded and primed. The process is: Initial round of putty. Sand putty. First coat primer. More putty (primer helps ability to see spots that need putty) Sand putty again. Second coat primer More putty and sand again. 3rd…
Pilot house covering boards
the miters on the covering boards for the pilot house were glued this week and are ready for permanent install. Even with a diesel heater running in the shelter, the epoxy took 3 days to set. It has been cold in Port Townsend!
”Behind the scenes” details
Asa spent more time this week adding sound proofing to the areas around the engine bay and installed rubber mat on the storage areas in the wheelhouse.
Dash mockup
Nonchalant will have modern state of the art electronics including Garmin GPS, AIS and radar. All components are NMEA 2000 and gauges will be digital – displayed on Garmin screen in dash. Asa built a mockup of the dash . When the components are not in use, they will fold down and be neatly hidden…
Solar panels installed
those who are following along since the start will remember that we ordered two flexible 330W solar panels (to be mounted on the aft cockpit roof). They will greatly extend the length of time Nonchalant can be at anchor! Taylor installed them this week on the roof of the aft cockpit.
Buffalo rails
Clint cut and installed the Buffalo Rails. The bow roller cast by PT Foundry will be “let in” the Buffalo rails and extend beyond the bow stem. The bolts and washers will be counter sunk and covered with bungs once the glue sets. The Buffalo rails will be varnished brightwork.
Second coat of bottom paint
Wiring progress
Taylor is getting all the main components of the electrical system wired together. The windlass controller and relay are also mounted and in place ready to be connected to the windlass
engine room access hatch – wheelhouse sole
Asa completed the hatches that will provide access to the engine room. They are both hydraulic assisted (hinges).
wheelhouse roof
The interior wheelhouse ceiling is exposed tongue and groove cedar (see prior post). To ensure that the roof is watertight, Clint and Asa cut and secured a layer of marine plywood and then covered that with fiberglass. It will be painted white.
Exterior Canvas
During my recent visit to Port Townsend I had a chance to meet with Nicole K. She is making all the exterior canvas and interior upholstery for Nonchalant. She suggested that I reconsider my color choice for the exterior canvas making the strong case that a khaki color was more in keeping with the classic…
Cockpit sole – teak
the teak cockpit sole was cut and glued down this week. Beautiful !!
Stem Iron
Dylan McKay “trued up” the stem iron on his press. It looks fantastic!
Teak!
Edensaw has delivered the teak that will be used in building the drawer and door faces and some of the cabinetry in the interior of Nonchalant. You have probably heard that teak is quite difficult to source and quite expensive. This is what $4300.00 worth of teak boards looks like! By the time these boards…
First coat of bottom paint!
fo’c’sle framing
Leigh is framing the boxes for the drawers in the bunks and has made cutouts for access to the thru hulls.
Wheelhouse overhead
Clint and Asa cut, oiled and installed the wheelhouse overhead tongue and groove ceiling. It is fabulous! They also dry fit the plywood overlay which will receive fiberglass to assure it is watertight. The beams will get teak varnished caps.
Electrical systems
Taylor has installed many of the major electrical components and is pulling wire to fixtures.
Half round
Clint and Asa have permanently installed the half round on the entire perimeter of the deck.
Salon mock up
while Leigh is busy with the permanent built-ins in the fo’c’sle, Leland has moved from the aft cockpit to the salon. He built a mockup layout in time for my visit last week. It came out great! The dining booths are comfortable and will easily convert to sleeping bunks. The galley is laid out to…
Fo’c’sle progress
Leigh has framed out the bunks and cabinets ..
salon mockup
Leland constructed a mockup for the salon interior. I will be visiting Port Townsend this week to finalize the plan!
Aft Cockpit sole and sills
Leland completed the install of the sole and sills in the aft cockpit. The sole will eventually receive teak decking.
Wheelhouse sole
Asa put in the framing for the wheelhouse sole which will be installed next week. The stairs will be removable to allow access to the back of the engine. There will be a plywood enclosure for the stairs that will be sound proofed on the engine side and copper on the side that will show…
interior finish prep
Daryl and crew continue to prep the interior wood for varnish. This has required endless sanding and spot staining to even out the surface.
House side reveal
Daryl and the finish crew have completed three coats of the white paint on the salon house sides. I am excited about the “new” look (vs varnish) and think it will make the bronze portholes, bronze railing stanchions and the varnished handrails and caps really stand out.
Rudder system
a number of people contributed to the rudder assembly. Armstrong Consolidated made the rudder table. Taylor did work on the table and rudder. Leland did the installation and the tube. Dylan (who straightened the drive shaft and made the driveline bearing) fashioned the tiller arm and other components from a bronze billet (pictured below).
Waggoner cruising guide – Ananda on the cover!
Photos of Ananda grace the cover of the Waggoner cruising guide (2025) and the Waggoner Ports and Passes. The photos were taken when we were anchored by Mink island in Desolation Sound this past summer.
Engine pan
The original engine / oil drip pan was removed from Nonchalant and reworked to fit under the new Yanmar engine. Some of the excess copper will be used in other decorative applications… but this is beauty meets function.
Samson posts
Leland and Asa came up with a unique design for the aft Samson posts. The original posts from Nonchalant were reused but required some repair. Leland cut off the rotten bottoms and clothespin scarfed new bottoms on to the posts. He commented ” they were the nicest pieces of teak I have ever seen.” With…
Fo’c’sle design
it is time for interior finishes! Most of Nonchalant”s interior is completely stripped. The only exception is the wheelhouse. All other areas will be rebuilt from scratch – utilizing some pieces that were salvaged. Leigh developed a design and mock up for the Fo’c’sle. The mockup allows us to view what the space will actually…
thru hulls
Leigh has drilled, backed and installed the thru hulls.
Asa is back! Driveline
Asa has returned from his time off and worked on the drive line this week – specifically getting the V strut (fabricated by Port Townsend Foundry) dry fit to the boat. There are some modifications that the foundry will perform before final installation. Look at that beautiful V strut and new propellor! V strut permanently…
Half round edge covering
Clint cut the pieces for the half round that runs along the entire perimeter of the boat on the edge of the cap rail. Once the pieces were cut, he made two passes on each piece with a round over bit (quarter round) on a router table. Stunning work! the corners will be carved tomorrow
Canvas and Interior Upholstery – Sound Canvas LLC (Nicole)
we have selected a local Port Townsend business to fabricate the aft cockpit canvas enclosures, butterfly hatch cover and interior upholstery… Sound Canvas LLC – Nicole K. We are excited to have her as part of the team. She is starting with the aft cockpit enclosure while the shipwright team builds out the interior. We…
Rudder table
Leland and Taylor spent time this holiday week patterning, fabricating and welding the rudder table parts. Leland also fit the rudder tube and fiberglassed the flange.
Wheelhouse finish – never ending sanding!
Daryl has been working to prep the wheelhouse for varnish… so much detailed sanding!
Webasto hydronic heat
Scott G. (Blue Peter Captain) has been installing the plumbing systems and hydronic heating system on Nonchalant while at the same time overseeing the work that is being done on Blue Peter at Haven Boatworks. The hydronic system will provide even, dry heating throughout Nonchalant and allow for shoulder and winter season cruising (and Alaska!).
Thru hulls
Leigh located the thru hull openings (7), drilled, prepared backing and installed.
Rudder table and tube, Black water tank, sills – aft cockpit
Leland has been busy in the aft cockpit! This week he fitted the sills, permanently bolted and isolated the black water tank and bored for the rudder tube. He also made patterns for the legs of the bearing table. The bearing table was fabricated at Armstrong Consolidated in the yard. I am reposting the rudder…
Bronze brackets
Taylor designed and has been machining bronze brackets for the salon. The brackets will be a visually stunning feature of the salon and also provide structural rigidity in place of the bulkhead we removed from the starboard side of the boat (to open up that full side of the salon).
Aft cockpit
Leland has been working on framing for the sole in the aft cockpit. He completed the framing and then cut and installed the plywood sub floor that will receive the teak laminate. It is going to be gorgeous! We have had lots of discussion around fixed bench seating and have decided to leave the cockpit…
Port holes installation
Leigh fabricated spigots and installed the port holes this week.
Port Holes
Leigh is working in the fo’c’sle where there were three port holes on each side of Nonchalant. These needed to be located and routed out of the new planking to reinstall – yikes! Measure twice – cut ONCE!
What a difference a year makes!
these are photos of Nonchalant taken November 10, 2024 and about the same time in 2023. https://www.icloud.com/sharedalbum/#B1gGfnH8tGG4nu4
Cockpit framing
Leland has been framing the aft cockpit… preparing for the sole. The sole will be teak like the deck and will be allowed to gray out. I am hoping for most of the space below the sole to be open for storage, but we may need to utilize some of it for ballast. there will…
Rudder specifications
Tim Nolan (naval architect pictured below) has developed specifications for the rudder and rudder assembly taking in to account the new load factors. New power, hydraulic steering and auto pilot have all been factored in. Taylor will fabricate the aluminum rudder stock.
Classic Yacht Association Change of Watch PNW fleet
Nonchalant will be registered in the PNW fleet of the Classic Yacht Association (Ananda was registered in the Canadian Fleet). The PNW fleet is the largest and most active fleet in the CYA. Last night I attended the annual Change of Watch dinner at the Seattle Yacht Club. During the Change of Watch, the current…
Edensaw Woods
We have sourced a lot of the wood for Nonchalant from Edensaw Woods. I visited Edensaw with Clint today in search of some teak for the sole of the aft cockpit. Teak has been hard to source, but Edensaw now has an ample supply. The sole of the aft cockpit will match the decking and…
PT Foundry
I visited PT Foundry today. Information on the history, process and products can be found on their website …. take a look. The emphasis on environmentalism is quite impressive and a central commitment. https://www.porttownsendfoundry.com Pete (owner) gave Clint and I a full tour and described the process. They fabricated a bow roller and anchor for…
driveline shaft tube
Asa worked on the shaft liner and integral bearings… the I strut is original. We are waiting for a custom strut from PT foundry that will go aft of the I strut just forward of the new propellor.
Half Round
Clint spent part of this week preparing the half round wooden trim that goes around the entire vessel. It is Padouk wood (similar to teak) that will be left to grey like the teak deck.
Paint and Varnish
It was a BIG WEEK for the finish crew. The hull is now painted. The aft cockpit varnish is finished. Shawn is going to get some primer on the overhead Saturday so the saloon finish can move forward. some sort of contaminant on the surface of the wheelhouse will have to be removed prior to…
Brackets
Taylor has been busy fabricating and installing brackets on the transom and bulkheads. This custom work is done in the Perpetual Boatworks shop in the boatyard.
Welcome Leland Gibson
We have added another talented shipwright to the crew – Leland Gibson. some info from the North West School of Wooden Boat Building site… Leland was raised on Lake Superior in Northern Michigan and spent his early life learning how to build boats with his dad (sometimes off the grid). He traveled extensively in his…
Fo’c’sle progress
Leigh continued work on the ceiling – looking great!
Removing the bug shoe video
Clint removed the hardwood bug shoe on the bottom of keel and all the woodblocking under keel. He replaced the blocking with pipe and jackscrews to aid with corkingand putting a new shoe on the keel. He corked the entire starboardside from the water line down with the exception of the garboard seam which will…
Finish work update
It was a big week for Daryl… here is her update I put 3 coats of varnish on the cockpit and transom and 2 coats on the starboard side. I dealt with the remaining epoxy that needed to be applied to some of the miter joints that were open on the trim. I primed the…
Ceiling in the fo’c’sle
Leigh spent the week working on installing the ceiling in the fo’c’sle. It is looking fabulous.
Switch Panel
Taylor machined a brass switch plate that will be positioned on the dash and control frequently used circuits.
Tender – Highfield Classic 310
Ananda towed a beautiful lapstrake row boat / sailboat as a tender. I have decided that my cruising plans for Nonchalant require a tender with power. I will be at anchor most nights and having the ability to utilize a tender for transportation to docks for hikes, provisioning, visits etc is going to be a…
Bottom side caulking
Clint and Asa started caulking the bottom sides this week.
Salon or Saloon? Ready for spray painting…and a special piece of furniture!
There seems to be a split on whether to call the space behind the galley the Salon or the Saloon. I can’t figure out why it is called either! Anyway… it is now prepped and ready for spray painting! The full wall bulkhead on the starboard side at the rear of the salon/saloon has been…
Decking cover planks
The decking cover planks are now glued in place. The center strake will be varnished as an accent, the rest of the deck will grey out.
Welcome Leigh – Irondale Woodworks
we have added another shipwright/carpenter to the team. Leigh’s focus will be interior. He started this week with the sole in the engine room. He also procured wood and began a design/layout for the ceiling.
layout
Teak decking progress
drive line
Deck work has begun!
Wooden Yachts of the Northwest
Peter Knowles ( http://www.youtube.com/@TravelsWithGeordie ) sent this feature along to me today. The references to Monk as a designer began to appear during the tenure of Katherine Bellows ownership, but I have been told by Tad Roberts that Monk would not have had a hand in the design as his first independent designs were 1935….
progress on hull finish – putty and filling seams
More varnish coats # 7,8 and 9
Fabricating
Most of the focus on wooden boat rebuilds is on the work of shipwrights and finish workers… but fabrication, systems design and installation all play a critical role as well. Taylor C is filling this key role at Perpetual Boatworks. He fabricated the fuel tanks, designed the electrical system (and built the panel) and most…
Tribute to Ananda
I sold Ananda yesterday (Sunday the 11th). She will stay in Egmont (and for now in my boathouse). I cruised over 3000 NM on Ananda without a breakdown. I made a lot of system improvements – windlass, macerator, diesel heater, goalzero house battery, solar panel and costway two zone refrigerator – were the big ones….
Princess Louisa coffee time
it is Friday the 9th and the current this morning has ananda’s stern facing Chatterbox falls (still flooding). View is unobstructed as there was a large exodus of vessels at yesterday’s afternoon slack. Doug and Deborah leave on Tango this morning headed for Powell River. I plan to spend another day / night and return…
Rafting with classics at Freil Falls
Left Harmony islands mid day on Monday and cruised to Freil Falls to meet up with Euphemia, Comrade, Thelonius and Black Dave. We rafted, swam and sat in the cool fresh water pools formed under the falls at low tide. Following that, we anchored and spent the night at Harmony Islands.
Pender Harbour Wooden Boat Show
Spent Friday through Sunday at the Pender Harbour Wooden Boat show. The show kicks off with a boat parade around the harbor (about 7 miles) led by a 50 Foot Ocean Alexander with a full bagpipe and drum band on the bow! Lots of boats and a lot of fun. Saturday and Sunday were filled…
finish work – first coat of primer on the hull
Daryl reports…. Pretty much just worked on the hull – lots of 80 and 120 grit long boarding, sanding block detailing and I also finished heat gunning off the finish on the guards, sanded and taped. I got 2 coats of primer on there – I’m using a new primer (PreKote Plus) that people around…
Plywood sub floor
Clint and Asa have been cutting and laying the plywood subfloor this week. The finished floor will be satin finished wide pine planking boards.
Interior
we are starting to have general discussions about the interior. The vision is pretty well set with the exception of the space between the aft salon bulkhead and stairs to the aft cockpit. In the original design, there was a sleeping quarters “for paid crew” to starboard and the main head to port. Originally we…
Asa declares the hull is faired and ready for paint. Daryl is excited to paint with primer next week!
overnight stop at hardy island on the way back to Egmont from Desolation Sound
sunrise Saturday July 27
desolation sound II – Teakerne arm / Cassel falls and lake
we cruised from Pendrell Sound to Teakerne arm… famous for Cassel falls and lake… on arrival wind was quite strong from the NW. I scouted a place to anchor, set Ananda’s anchor and scrambled up a rock wall to tie a stern line around a large tree. Faranda and Maverick both set anchors and rafted……
The Yanmar engine was lowered in to Nonchalant by crane … more details to follow
Desolation Sound II
Another cruise to Desolation sound. Copeland islands. Grace harbor. Mink island. Pendrell cove. Teakerne Arm … above…mink island anchorage above…Grace Harbor anchorage some views from Pendrell Cove above… the classic yacht summer wind anchored in Pendrell Sound.
Hull caulking and fairing
Hull fairing
Drive shaft and aqua drive in place in preparation for engine install
Desolation Sound Cruise
set out for Desolation Sound Tuesday July 3. First stop hardy island. from hardy island, cruised to the anchorage in the Copeland islands and circumnavigated by kayak. from Copeland islands to Grace Harbor hiked the trail in Grace Harbor to a beautiful fresh water lake and had a wonderful swim from Grace harbor to refuge…
topsides are caulked
and Asa says “Next week we will be finishing up patches in the old planking. Fairing. Plugging fastener holes and hopefully get to seam compound and then the topsides are close to ready for paint‘
Main salon is stripped of lead paint and ready for new white!
Original air compressor for the horn
Taylor discovered the original air compressor for the horn! It was in the faux smoke stack where the propane is safely stored. He hooked it up and it still works! Made in France in the 1920s!
Electric system schematic
planking is complete and faired
starboard side planking is complete
planking on the starboard side of Nonchalant is complete. Corking and fairing will be next week.
Restoration? Replica? Rebuild? Preservation Rebuild
My visit to Port Townsend this week got me thinking about how to accurately describe the Nonchalant journey from May 2023 purchase to late 2024 launch. Tuesday evening as the sun set, I watched Leo pilot Tally Ho out of the Port Townsend harbor and into the bay. Tally Ho is perhaps the most well…
Paint in the main saloon
Daryl and Nic continue to work to remove / strip the old lead paint from the main saloon. We ordered a second bucket of the lead paint stripper and they applied and removed as much of the remaining lead paint as they could this week. Whie effective, it has left behind a greasy residue and…
Planking update
Clint reports “Bottom is all closed up except for one small plank back aft that I’m gonna let “the fastener guy” cut and hang in exchange for taking on the mundane task of pounding nails hour after hour. 3 planks left in the bow (stbd), and the turn of the bilge. The stbd side turn…
building and installing the side decks video
Smuggler’s Cove 2
back in Smuggler’s Cove. Cruised to Smuggler’s cove Wednesday June 19. After anchoring and stern tying, launched my kayak and paddled to Secret Cove. On the way I had a wonderful encounter in a shallow lagoon. it was delicious! circumnavigated thormanby islands today (June 20).
more planking… fabulous
Daryl suited up and tackled the nasty work of stripping the lead paint
planking, planking and more planking is how Clint described the week!
planks are being attached with hot dipped galvanized boat nails true to how she was originally fastened
prepping to strip interior paint
Daryl spent half the week meticulously prepping to strip the paint from the ceiling and other areas of the main saloon. As was mentioned in a previous post, the paint was tested and found to contain lead…ugh! The stripping will happen Monday.
transom! And more varnish photos
Hardy Island
cruised Ananda to Hardy Island Wednesday afternoon. On the way, I could smell exhaust fumes. On inspection I found a corroded hole where the wet exhaust joint fits to the engine. Fortunately, I carry JB Weld sticks and was able to completely seal the small hole when I anchored. I paddled around hardy island and…
Fuel Tank fabrication and install video
hand carved spoons
my friend Dave carves as a hobby. When he saw the scrap wood on the ground from the Nonchalant restoration, he asked if I could gather some and bring it to him in BC. Of course! This morning he boated down to my cottage to pick up some prawn heads to make a soup base…
Princess Louisa Inlet
Left Wednesday at 7 am for the 30 NM cruise to Malibu Rapids which must be transited at slack to enter the inlet (in a classic cruiser like Ananda). Peter joined on Euphemia II. He had to transit skookumchuck narrows at slack (5:30 am) prior to joining me. My admiration of Euphemia II was the…
Varnish!
Daryl and Nic are applying varnish (after many, many hours of prep) and it is looking great!
Planking!!
planking has begun… material was moved from near the shop to next to the shelter. the first broad and garboard planks are on! The garboard planks are 10” wide!
Princess Louisa inlet
departed home at 0700 for Malibu rapids slack at 1330. Then on to chatterbox falls. Peter H is joining on his wonderful yacht Euphemia II. This yacht was the inspiration for my purchase of Nonchalant.
solar panels
we ordered two flexible 330W solar panels that will be mounted on the aft cockpit roof. They will greatly extend the length of time Nonchalant can be at anchor!
Fuel tanks
Taylor has been welding / fabricating the fuel tanks for install late in June.
Bulkheads are installed
another trip to Freil Falls on Ananda
took a dinner cruise with a group of neighbor friends to Freil Falls. We have heavy rain the last several days so the falls were roaring. Here is some incredible drone footage that Glenn shot…
Port Townsend visit
I visited Nonchalant and the crew at the Port Townsend yard yesterday. I had a good chance to see all the work that is completed and it looks great. We spent time discussing interior layout and finish work. The house is being attached this week and soon after the shipwrights will begin planking the hull!…
Driveline ~ shaft lining tube
Smuggler’s Cove
cruised on Ananda to Smuggler’s Cove. Smuggler’s cove is about 20 NM from my cottage in Egmont and a fabulous anchorage. paddled to thormanby island and walked the beach at low tide
Freil Falls
one of my favorite afternoon cruises is to Freil Falls in Hotham Sound. Freil Falls is about 7 NM from my cottage (Yugen) on the east side of the Sechelt inlet in Old Egmont. Hotham Sound looking at Harmony Islands. the majestic 1400 foot Freil Falls.
ananda
Ananda is a 32 foot Tri cabin cruiser built in Everett, Washington by Peter Hansen and launched in 1932. I have cruised extensively on Ananda for the past three seasons covering over 1200 Nautical Miles each season. Last season I spent over 80 nights aboard. We have cruised the Salish sea from Victoria to Desolation…
it’s boating season!
up until now, this blog has focused exclusively on the restoration of Nonchalant. While I was hoping the blog would shift to Nonchalant cruising content in July, those of you following along know that the launch date has been deferred until November. In the meantime, I will be spending the season cruising on Ananda –…
Mast
Daryl sanded and sanded on the mast and spreaders, but was not able to get them to a varnish ready condition – stains are just too deep. So, the mast and spreaders will be painted white!
Side deck
This week Clint and Asa made and installed the harpin, installed the spur beams. made and installed stern bit blocking and cut the side deck plywood for install next week.
side decks
Clint and Asa are preparing the side decks for plywood and fiberglass.
Hawse
Clint and Asa did some work setting up for the hawse. We debated using a unique extending bow roller system fabricated by PT foundry. It is a work of art and is currently on order for installation on the wonderful classic yacht MV Faranda. In the end, because I will be single handing Nonchalant most…
Fuel tanks
Taylor designed the fuel tanks this week and took the specs to ACI for fabrication. We are awaiting a price and timing. Nonchalant will carry about 200 gallons of diesel fuel.
starting to look like a boat!
Floors, engine beds and forward sole supports
McMurry windlass
one of the coolest fixtures on Nonchalant is the beautiful McMurry windlass! Taylor has restored and polished it and it is gorgeous. He is also fitting it with a new motor which will allow for two way (Up and down) operation from the helm and from a remote with a chain counter. Nonchalant will have…
foredeck is glassed and covered
the foredeck has two layers of marine grade plywood and is now sheathed in fiberglass to make certain it is watertight. It is covered with paper to protect it while being walked on, but will soon receive teak laminate that will be stunning.
great video of recent work
bronze parts
Taylor has removed the bronze port holes and is working on refinishing … bringing them back. Some of them were brass plated. Some were corroded. These are Wilcox Crittenden port holes – original to Nonchalant!
Foredeck
The new deck will consist of two layers of marine plywood and a layer of fiberglass under the teak. This will insure a completely watertight deck system and also create rigidity and strength. The underside (Visible in the stateroom ) is grooved and looks like planking. It is painted white. The two layers are now…
Timeline
I visited Nonchalant in Port Townsend this week to view the progress and meet with the crew to discuss the new timeline for completion and all the resulting implications. We also got to spend time away from the boat to get better acquainted which was very rewarding. A few highlights… Asa is building a house…
Connected stem to stern – revised launch date.
The stringers are now fastened stem to stern. There are also some planks fastened. We had a conversation mid-week during which Clint and Asa informed me that Nonchalant is not going to be complete by the July launch date. I am visiting Port Townsend this upcoming week and we will talk more about a realistic…
Deck beams painted
Daryl and nic are working to paint the deck beams in a paint room in the new Perpetual Boatworks shop.
Sheer planks
Clint and Asa line out, pattern, cut, steam and install the port and starboard sheer planks.
planking stock is at the yard
This cedar stock was milled by Paul Mahan and kiln dried. The video link demonstrates the kiln drying process. Asa commented “It’s virtually the same (as the video below) , only the wood slides into the kiln on a cart. The idea is to bring the temp up while holding the humidity and very slowly…
Bilge stringers
Asa made and installed bilge stringers
Finish work at the shop
weekly update from Daryl… We worked on the pieces that were pulled off the boat initially that we know are being put back (ie what we scraped back in October), the beam caps, the doors and the door frames. Most of it was already scraped and somewhat sanded (minus one of the stair sets, so…
Deck
Work has begun to replace the deck. Beam shelves have been patterned, cut and installed. Foredeck has been removed and beams have been laid out.
Keel cheeks
the keel cheeks are finished and installed. The keel cheeks are bolted to either side of the keel and the frame heels are fitted and fastened to them.
Centerline and final frames video
The lower half of the shaft log is 6”x9”x12’ that tapers in width to 4” to meet the old keel. The upper shaftlog/horn timber is 6” x7”x21’ and swells to 12” in depth to meet the lower shaft log…all hand crafted from Purple Heart.
Rudder oops – not so fast
in a discussion today (2/20/2024) with Clint and Asa, they persuaded me to stick with the original rudder and see how the boat handles. The rudder is an original cast bronze piece and is worth preserving as part of the refit if Nonchalant handles well. If it turns out the boat does not handle well,…
Deck
The original Cyprus cedar decking is very tired and the seams are splitting. It was treated with Cetol years ago and has turned an ugly orange. We had originally planned to replace the existing decking with Sapele. Our preference was teak, but availability and cost lead us to settle for Sapele. Clint and Asa had…
shaft tube and stuffing box
The shaft tube and stuffing box were installed this week. Final dimensions for the aqua drive have been sent to the naval architect. Exciting progress!
Floors
The floors in the cockpit and main saloon have been built and installed. The rich look is a result of applying “boat sauce” to the wood…a mixture of linseed oil, turpentine and pine tar. It has a distinctive and wonderful smell and a rich look.
Finish work – sanding and more sanding
Daryl and Nic continue to strip, sand and seal … this week they removed the doors. They are a good example of the deterioration of the woodwork. While Nonchalant was docked at Center for Wooden boats, the water damage was quite extensive. There are spots on the house sides that will require repair because they…
Forefoot bolted in place
Horn timber and shaft log
The horn timber and shaft log are now complete and permanently bolted in Nonchalant! You can see the grooves on either side of the shaft bore where the fiberglass splines will run the length of the split in the shaft log.
stem and forefoot
work on the centerline continued this week….
Port Angeles Boathouse
My waterfront property in BC is located in an area (Swiya) that is the traditional land of the indigenous Shishalh band. The Shishalh band in conjunction with the BC PROVINCIAL GOVERNMENT is in the process of implementing a Dock Management Plan that will (Among many other onerous provisions) prohibit boathouses at private Moorage foreshores. If…
Big Leaf Maple Syrup
Hi all, Daryl here. I took a short break from working on Nonchalant to make bigleaf maple syrup! This is my eighth season sugaring on my property. About 15 acres of the land is a maple forest. For a long time it was assumed one couldn’t produce syrup from our trees but you most definitly can!…
centerline install
Clint and Asa are installing the centerline! Taylor is producing some video that will posted at the end of the week.
Centerline progress
Clint and Asa built the horn timber, shaft log, forefoot and stem this week. Installation next week. Seeing the pieces on their sides and outside the boat, it is difficult for me to see how it all comes together, but Asa assures me it will all make sense next week! The timbers are beautiful and…
Centerline – shaft log
This week Clint and Asa focused building the horn timber / shaft log which is 24 feet of centerline from the transom to the keel.
Displacement – 29,000 pounds
Tim N. (naval architect writes “Hi Nonchalant Team, Clint just asked me what the displacement/weight of the boat will be. According to the old waterline it weighed around 29000 lbs and was floating nice and level in trim. I think the finished weight will be about the same, maybe lighter: the new motor and gear…
Daryl’s finish work report
I finished scraping the port house sides and started sanding them. I sanded the upper eyebrow in the cockpit and, most exciting of all – I scraped and did the first sand on the transom! It already looks amazing! Although there weren’t too many spots where it actually flaked off and turned grey, it was…
Centerline
Asa and Clint are turning attention to the centerline. They investigated the bow section further and determined that replacing the entire stem would be best for the structural integrity of Nonchalant. There was checking as well as rot around the old fasteners. The stem is the curved edge stretching from the keel below, up to the gunwale of the…
New Propellor!
Tim N. (naval architect) has determined that “there will be a gain in efficiency if we go to a slightly bigger 3 blade propellor with narrower blades. This will be a high end custom made propellor manufactured on a CNC machine at the venerable and respected Hung Shen Propellor company in Taiwan. The CNC propellors…
Detroit Diesel off to a tugboat
Seaborn Pile Driving Seaborn Pile Driving | Dock Construction and Dock Repair in Seattle and Lake Washington had a Detroit diesel engine fail in one of their tugboats. The engine that failed was identical to the engine we removed from Nonchalant. Adair James (mechanic) had worked on the engine for me and was confident that…
Continued refinement of the engine and driveshaft specs
Canadian Red Ensign stern flag
Nonchalant received a Christmas gift from an ardent classic yacht owner. In fact, the purchase of Nonchalant was inspired by my admiration of Peter H’s yacht Euphemia II. https://classicyachtinfo.org/yachts/euphemia-ii https://classicyachtinfo.org/yachts/euphemia-ii more detailed info on the flag. https://en.wikipedia.org/wiki/Canadian_Red_Ensign https://en.wikipedia.org/wiki/Canadian_Red_Ensign photo of Euphemia II at my dock in Egmont flying the Canadian Red Ensign stern flag. What…
Holiday progress
work on Nonchalant has slowed somewhat during the holiday period…but progress nonetheless! Daryl has continued stripping, sanding and sealing. Asa has begun work on the stringers. Everyone is off this next week and back to it the first week of January. Happy Holidays to all and thanks for your work on this passion project. We…
Shaft and Engine drawing
Tim Nolan from Tim Nolan Marine Design selected the engine and is preparing all the drawings for the placement, shaft and propeller. He is having a CNC template made of the new engine to help with placement. His update… I am having a template made (CNC, 3/4″ Particle Board) of the new engine to help…
Stripping, sanding and sealing this week
update from Daryl… It’s been a really productive week! We got a lot of the varnish stripped, the bare wood protected and power sanded and some of it has been hand sanded, which is the final sand before sealing. We’re doing it in sections, so the goal is to get a couple sealer, protective coats…
Framing video
3 D scans
these scans show the reshaping of the hull.
Stripping, sanding and varnishing the cabins
Daryl and Nic are starting to strip and sand all of the exterior cabin surfaces. A rough estimate of the time involved to strip, sand and varnish the exterior cabins is 600 hours… lots of hard work ahead.
Framing take #2
Clint and Asa were unhappy with the oak originally sourced for planking. They ordered replacement white oak from Edensaw that arrived at the yard last week. They started milling, steaming, bending and installing new frames on Monday Nov 20. For those interested in material costs … the oak was $10.50 per board foot delivered. many…
Cedar Planks
Asa went down to the mill today to check on the cedar being cut for the planking and reports “it looks beautiful”
Electronics package / Navigation
Scott G is a Garmin rep and up to date on the latest tech. He has designed the new electronics / navigation package for Nonchalant. NMEA 2000. AIS. GPSMAP 8616xsv Garmin GPSMAP® 8616xsv | Chartplotter and Sonar GMR Fantom 18x dome radar Garmin GMR Fantom™ 18x/24x Dome Radar | Marine GC 14 marine camera for…
Where will you keep Nonchalant?
Yanmar 4LV 150
Tim N. (naval architect) is recommending we repower with a Yanmar 4LV 150 with a parallel gear, ZF68 with a 2.78:1 reduction. This is a tier 3 compliant fully modernized engine. The package is available through a local dealer in Port Townsend. My local mechanic on the Sunshine Coast ( Infinity Marine Josh B) is…
Finish work
Some of the interior panels, the cap rails and the butterfly hatch have been sent to the finish team – Daryl and Nic. Prep work on interior pieces continues… here are some pictures received 10/30
Engine removal
Prior to closing in the structure, the engine needed to be removed (required a crane). A hole was cut in the wheelhouse roof and the engine was lifted out along with the gearbox. The engine weighed approximately 2100 pounds and the gearbox another 700 pounds. A new engine will be smaller, weigh less than1000 pounds…
Building the shelter
Port Townsend is about to get very rainy and windy. Since the framing was delayed due to material deficiencies, the shipwrights erected the structure that will allow them to work in a protected environment.
False start on framing
Subsequent to our October 2 meeting the shipwrights sent the interior panels, rail caps and butterfly hatch to the finishers so they could get started sanding and refinishing. Daryl D. and Nic D are the finishing team. The shipwrights began working with the oak that had been ordered from a local sawyer to mill and…
October 2 on site meeting
on Monday October 2 I met with Clint and Asa (shipwrights) as well as Scott G. who had joined the team as a project coordinator. Scott had Captained MV Olympus for years and is currrently the Captain of MV Blue Peter. He has extensive experience in all facets of restoration work. He will also develop…
September
Clint and Asa began working on Nonchalant just after the Labor Day weekend. The initial work was removing fuel tanks, and all of the interior aft of the wheelhouse, removed railings, mast etc. During this period, they also reshaped the hull which was badly “hogged” due to the instability of the hull structure and the…
The shipwrights – Clint and Asa
I was fortunate to find two experienced shipwrights that agreed to team up and restore Nonchalant!
Preliminary examination
After Nonchalant was safely on the hard and blocked up, Clint Thompson did an initial inspection. Following this early assessment, Nonchalant sat on the hard in the boatyard until September when the shipwrights finished work on the projects they had previously booked.
Purchase and the harrowing journey from Lake Union to Port Townsend
Prior to my purchase of Nonchalant in May 2023, she was owned by Mike Wallaston. He donated the vessel to The Center For Wooden Boats in 2020 (they sell donated vessels to support their work on Lake Union). The vessel had been surveyed in 2018 with no significant issues. The Center For Wooden Boats displayed…